FAQ
WHAT IS THE ESTIMATED FIELD INSTALLATION TIME?
Installation time is approximately 15 minutes.
HOW DO YOU MOUNT THE HOOK PLATE?
The hook plate can either be bolted into the wall of the inlet or on the metal frame of the inlet (if possible).
WHAT SIZES OF MDI'S DO YOU OFFER?
Each MDI is hand made to the exact specifications that your job requires. That ensures the best fit, as well as the best results.
DO YOU HAVE TO HAVE A NEW BOX/ INLET IN ORDER TO INSTALL THEM?
No! The MDI was created with retrofitting in mind. It is the same installation time, it will just require getting into the manhole to install the hook plate.
​
HOW DO YOU MAINTAIN THE MDI ONCE INSTALLED?
Maintenance with the MDI is incredibly simple. Pull the manhole cover off and use a vacuum truck to remove the debris. The time between maintenance is dependent on if the MDI is in a "hot spot" or not.
HOW DO I KNOW WHERE TO PUT THE MDI'S ON A SITE?
Our team is here to help in order to help with determining your potential "hot spots" that will maximize the effect of the MDI. Please reach out!
HOW DO I GO ABOUT ORDERING?
The team at Outfall Protection Technologies is committed to giving you the best experience possible. Simply hit the "Contact Us" button below, and we will be sure to answer all of your questions and provide you with a customized quote.
